Factory / Light Manufacturing (Non-Hazardous Process): setup and training guide

On this page

This page is the part of the onboarding kit that is specific to a Factory / Light Manufacturing (Non-Hazardous Process). It lists what the app will set up for you, who in your team normally does each piece, and what you need to have ready. How to use the app is in the shared guides, which are the same for every organisation:

The lists below come from the same rule set the app uses, so they match what you will see. What actually applies to your site depends on your answers during setup: a rule marked "depends on your site" is only switched on if you have, for example, a borewell or a kitchen.

1. At a glance

WhatHow many (maximum)
Rules that apply to every Factory2
Rules that depend on what is on your site16
Good-practice rules (recommended)8
One-time setup items (photos, documents, certificates)54
Recurring jobs (daily to yearly)48
Things you log when they happen12
Licence renewals tracked18
Statutory filings4

Most sites end up with fewer than the maximum, because the setup questions switch off what does not apply.

2. Who you need on the app

Each row is a job in your organisation, not necessarily a separate person. In a small site one person often holds several rows: the manager is usually also the compliance officer. Every person signs in with their own account, so the record shows who did what.

RoleApp accessWhat they look afterNeeded?Items they own
ManagerManagerFactory ManagerYes9
Compliance officerManagerOSH Code (factory) / SPCB / CPCB liaisonYes70
Operations supervisorSupervisorShop-floor operations, safety officer dutiesYes44
Housekeeping / floor staffWorkerProduction line / housekeepingYes13

App access decides what a person sees. Manager: the web portal and the phone app, with setup, approvals, reports and filings. Supervisor: the phone app, with their team's jobs and approvals. Worker: the phone app, with their own jobs only.

3. Before setup: have these ready

Questions the setup will ask about your site

Setup takes about 30 to 45 minutes if you have these answers to hand. "Not sure" is fine for anything you can find out later; you can change answers afterwards.

Numbers

  • Number of diesel generators on site
  • Diesel/fuel storage capacity on site
  • Number of lifts
  • Number of escalators / moving walks
  • Connected electrical load (kW)
  • Age of the building (years)
  • Contract workers engaged through contractors
  • Plot area (sq m)
  • Solar plant capacity (kW)
  • Number of employees / workers on site

Yes or no

  • Bulk Waste Generator (meets waste-quantity threshold requiring registration)?
  • Machinery maintenance generates incidental hazardous waste (used oil, solvents, etc.)?
  • Electrical/electronic equipment on premises?
  • UPS/inverter batteries on premises?
  • Borewell / groundwater extraction on premises?
  • Manufacturing process generates liquid effluent (distinct from domestic sewage)?
  • Undergoing active construction/renovation/expansion?
  • Rainwater harvesting on site?
  • Employs 10 or more people (incl. contract/interns)?
  • Uses septic tank / storage tank (no onsite STP)?
  • Requires Shops and Establishments registration under state labour law?
  • Steam boiler on premises?
  • Security guards supplied by an agency?
  • State law requires rainwater harvesting here (derived from state and plot area; not asked)?
  • Rooftop / ground-mounted solar plant on site?
  • Employs 20+ workers with power (40+ without), contract workers included — a factory under the OSH Code, 2020?

Other details

  • No-STP wastewater scenario

Documents and licences to gather

Collect what you already have as PDFs or clear phone photos. Anything you do not have yet stays on your list as a gap; it does not block setup.

DocumentNeeded
☐ Factory license from State Labour DeptIf Factory licence (OSH Code) applies
☐ Fire Safety NOC from State Fire ServiceAlways
☐ CPCB BWG registrationAlways
☐ SPCB HWM Authorization (Form 1)If HWM Rules 2016 — SPCB CTE + CTO applies
☐ CGWA NOC or exemption certificateIf Groundwater Extraction (CGWA) applies
☐ ETP/STP SPCB Consent to Operate (each ETP)If Effluent Treatment Plant (ETP) applies
☐ C&D Waste Management PlanIf Construction & Demolition (C&D) Waste applies
☐ ULB approval/intimation for large C&D projectsIf Construction & Demolition (C&D) Waste applies
☐ PESO petroleum storage licenseIf Diesel Storage Licence (PESO) applies
☐ Rainwater harvesting system installation certificate (each rainwater pit)If Groundwater Extraction (CGWA) / Rainwater harvesting applies
☐ Diesel generator (DG) exhaust stack height compliance certificate (each DG set)If Diesel Generator (DG) Air & Noise Norms applies
☐ SPCB Consent to Operate (CTO) for diesel generator (DG)If Diesel Generator (DG) Air & Noise Norms applies
☐ Shops & Establishments Act registrationIf Shops & Establishments Registration applies
☐ POSH Internal Complaints Committee constitution (incl. external member)If POSH Internal Complaints Committee applies
☐ STP Consent to Operate from SPCB (each STP)If Effluent Treatment Plant (ETP) applies
☐ EBWGR certificates (dry, sanitary and special-care waste; wet waste if not processed on site)Always
☐ Lift licence / registration (each lift)If Lifts & escalators applies
☐ Lift maintenance contract (AMC)If Lifts & escalators applies
☐ Lift third-party insuranceIf Lifts & escalators applies
☐ Electrical installation inspection / self-certificationAlways
☐ Electrical Safety Officer appointmentAlways
☐ Fire-safe wiring and supply isolation certificateAlways
☐ Boiler registration and certificate to useIf Steam boilers applies
☐ Municipal trade / health trade licenceAlways
☐ Occupancy / completion certificateAlways
☐ Structural stability certificateAlways
☐ Contractor labour licences (50 or more contract workers)Always
☐ Security agency licence (PSARA)Always
☐ Privacy notice for residents / visitors / customers / staffAlways
☐ Personal data breach response planAlways
☐ SPCB Consent to EstablishAlways
☐ SPCB Consent to OperateAlways
☐ Electrical Inspector approval of the rooftop solar plantAlways
☐ Self-certification of the rooftop solar plantAlways
☐ Net-metering / grid connection agreement with the discomAlways
☐ Crèche facility for employees' children (50 or more employees)Always
☐ Workers' canteen (100 or more workers, including contract labour)Always

4. Setup evidence: your first-weeks checklist

Setup evidence is the one-time proof of what is on your site: a photo of each bin, the STP nameplate, a copy of each licence. After setup each item appears as a job under Setup Evidence. Photo items for equipment start with a scan of that item's QR sticker, so stick the stickers on first (see Setup evidence and QR stickers).

Compliance officer

ItemEvidenceNeeded
☐ Factory license from State Labour DeptCertificateIf Factory licence (OSH Code) applies
☐ Fire Safety NOC from State Fire ServiceCertificateAlways
☐ CPCB BWG registrationCertificateAlways
☐ SPCB HWM Authorization (Form 1)CertificateIf HWM Rules 2016 — SPCB CTE + CTO applies
☐ CGWA NOC or exemption certificateCertificateIf Groundwater Extraction (CGWA) applies
☐ ETP/STP SPCB Consent to Operate (each ETP)CertificateIf Effluent Treatment Plant (ETP) applies
☐ ULB approval/intimation for large C&D projectsDocumentIf Construction & Demolition (C&D) Waste applies
☐ PESO petroleum storage licenseCertificateIf Diesel Storage Licence (PESO) applies
☐ Diesel generator (DG) exhaust stack height compliance certificate (each DG set)DocumentIf Diesel Generator (DG) Air & Noise Norms applies
☐ SPCB Consent to Operate (CTO) for diesel generator (DG)CertificateIf Diesel Generator (DG) Air & Noise Norms applies
☐ Shops & Establishments Act registrationCertificateIf Shops & Establishments Registration applies
☐ POSH Internal Complaints Committee constitution (incl. external member)DocumentIf POSH Internal Complaints Committee applies
☐ STP Consent to Operate from SPCB (each STP)CertificateIf Effluent Treatment Plant (ETP) applies
☐ EBWGR certificates (dry, sanitary and special-care waste; wet waste if not processed on site)CertificateAlways
☐ Lift / escalator nameplate photo (each lift)PhotoIf Lifts & escalators applies
☐ Lift licence / registration (each lift)CertificateIf Lifts & escalators applies
☐ Lift maintenance contract (AMC)CertificateIf Lifts & escalators applies
☐ Lift third-party insuranceCertificateIf Lifts & escalators applies
☐ Electrical installation inspection / self-certificationCertificateAlways
☐ Electrical Safety Officer appointmentDocumentAlways
☐ Fire-safe wiring and supply isolation certificateDocumentAlways
☐ Boiler registration and certificate to useCertificateIf Steam boilers applies
☐ Municipal trade / health trade licenceCertificateAlways
☐ Occupancy / completion certificateCertificateAlways
☐ Structural stability certificateCertificateAlways
☐ Contractor labour licences (50 or more contract workers)CertificateAlways
☐ Security agency licence (PSARA)CertificateAlways
☐ Privacy notice for residents / visitors / customers / staffDocumentAlways
☐ Named contact for personal-data grievancesDeclarationAlways
☐ Personal data breach response planDocumentAlways
☐ SPCB Consent to EstablishCertificateAlways
☐ SPCB Consent to OperateCertificateAlways
☐ Electrical Inspector approval of the rooftop solar plantDocumentAlways
☐ Self-certification of the rooftop solar plantDocumentAlways
☐ Net-metering / grid connection agreement with the discomDocumentAlways
☐ Crèche facility for employees' children (50 or more employees)DocumentAlways
☐ Workers' canteen (100 or more workers, including contract labour)DocumentAlways

Manager

ItemEvidenceNeeded
☐ Bin overview photo (position, label & lid) — per bin (each bin)PhotoAlways
☐ C&D Waste Management PlanDocumentIf Construction & Demolition (C&D) Waste applies
☐ Secondary containment (bunding) photoPhotoIf Diesel Storage Licence (PESO) applies
☐ Rainwater harvesting system installation certificate (each rainwater pit)DocumentIf Groundwater Extraction (CGWA) / Rainwater harvesting applies
☐ Composting unit full overview (each compost unit)PhotoAlways
☐ Diesel generator (DG) set — full installation overview (each DG set)PhotoIf Diesel Generator (DG) Air & Noise Norms applies
☐ STP full installation overview (each STP)PhotoIf Effluent Treatment Plant (ETP) applies
☐ Consent-to-Operate document displayed near STP (each STP)PhotoIf Effluent Treatment Plant (ETP) applies

Operations supervisor

ItemEvidenceNeeded
☐ Four-stream segregation signage and bin infrastructure photoPhotoAlways
☐ Composting unit capacity label (each compost unit)PhotoAlways
☐ Compost output storage area (each compost unit)PhotoAlways
☐ Diesel generator (DG) capacity nameplate (each DG set)PhotoIf Diesel Generator (DG) Air & Noise Norms applies
☐ STP capacity nameplate or equipment label (each STP)PhotoIf Effluent Treatment Plant (ETP) applies
☐ STP inlet connection from building drainage (each STP)PhotoIf Effluent Treatment Plant (ETP) applies
☐ STP outlet pipe destination connection (each STP)PhotoIf Effluent Treatment Plant (ETP) applies
☐ STP sludge disposal / drying area (each STP)PhotoIf Effluent Treatment Plant (ETP) applies
☐ Electrical danger notices and shock-treatment chartPhotoAlways

5. Your recurring jobs

These are created automatically once setup is done and come back on their own schedule. Each shows on the phone of the person it is assigned to. The "Usually done by" column is the default; the manager can reassign any job (see Manager guide).

Every day

JobUsually done byEvidenceNeeded
Daily waste weighment logHousekeeping / floor staffReadingsAlways
Food and garden waste composting / processing logHousekeeping / floor staffReadingsAlways
Daily C&D waste volume log by categoryHousekeeping / floor staffReadingsIf Construction & Demolition (C&D) Waste applies
Daily borewell pump run log (each borewell)Housekeeping / floor staffReadingsIf Groundwater Extraction (CGWA) applies

Every week

JobUsually done byEvidenceNeeded
On-site C&D waste segregation zone photo (4-category)Housekeeping / floor staffPhotoIf Construction & Demolition (C&D) Waste applies
No unauthorized C&D dumping declarationOperations supervisorDeclarationIf Construction & Demolition (C&D) Waste applies
Weekly groundwater abstraction log (per borewell) (each borewell)Housekeeping / floor staffReadingsIf Groundwater Extraction (CGWA) applies

Every month

JobUsually done byEvidenceNeeded
Monthly PPE provision and distribution checkCompliance officerPhotoIf Factory licence (OSH Code) applies
Monthly machine guarding and LOTO checkCompliance officerChecklistIf Factory licence (OSH Code) applies
Fire system maintenance (extinguishers, hydrants, sprinklers)Operations supervisorDocumentAlways
Monthly single-use plastic ban auditOperations supervisorChecklistAlways
Dry plastic waste to authorized recyclerOperations supervisorDocumentAlways
Monthly no-open-burning declarationOperations supervisorDeclarationAlways
Monthly HWM segregation and storage checkOperations supervisorPhotoIf HWM Rules 2016 — SPCB CTE + CTO applies
Monthly groundwater level monitoring (each borewell)Housekeeping / floor staffReadingsIf Groundwater Extraction (CGWA) applies
Monthly ETP performance log (each ETP)Housekeeping / floor staffReadingsIf Effluent Treatment Plant (ETP) applies
Monthly ETP effluent quality test (each STP)Operations supervisorDocumentIf Effluent Treatment Plant (ETP) applies
ETP sludge disposal log/receipt (each ETP)Operations supervisorDocumentIf Effluent Treatment Plant (ETP) applies
No effluent to groundwater declarationOperations supervisorDeclarationIf Effluent Treatment Plant (ETP) applies
Sanitary waste stream handover log (SWM 2026)Housekeeping / floor staffDocumentAlways
Special-care waste stream handover log (SWM 2026)Housekeeping / floor staffDocumentAlways
Monthly rainwater harvesting structure maintenance log (each rainwater pit)Operations supervisorDocumentIf Groundwater Extraction (CGWA) / Rainwater harvesting applies
Septic tank / cesspool desludging log (each septic tank)Housekeeping / floor staffDocumentIf Sewage Treatment Plant (STP) Consent applies
Monthly lift maintenance visit (each lift)Operations supervisorChecklistIf Lifts & escalators applies
Monthly first-aid box checkOperations supervisorChecklistAlways
Used engine oil handover to a registered collection agent / recyclerOperations supervisorReadingsIf HWM Rules 2016 — SPCB CTE + CTO applies

Every quarter

JobUsually done byEvidenceNeeded
Quarterly fire escape signage and emergency lighting checkOperations supervisorPhotoAlways
Fire drill and staff evacuation training recordOperations supervisorDocumentAlways
Quarterly statutory welfare facilities check (washing, first aid, rest room, canteen)Compliance officerChecklistIf Factory licence (OSH Code) applies
Quarterly lift test by a registered person (each lift)Operations supervisorDocumentIf Lifts & escalators applies
Lift rescue device, alarm and intercom check (each lift)Operations supervisorChecklistIf Lifts & escalators applies

Every six months

JobUsually done byEvidenceNeeded
6-monthly certified fire system inspection (IS 2190)Compliance officerDocumentAlways
Six-monthly lift test by an authorised person (each lift)Operations supervisorDocumentIf Lifts & escalators applies
Lift rescue mock drillOperations supervisorDocumentIf Lifts & escalators applies

Every year

JobUsually done byEvidenceNeeded
Annual worker health checkup (hazardous stream workers)Compliance officerDocumentIf Factory licence (OSH Code) applies
Annual DG stack emission test (SPM/SO₂/NOₓ) (each DG set)Operations supervisorDocumentIf Diesel Generator (DG) Air & Noise Norms applies
Annual noise level test at property boundaryOperations supervisorDocumentIf Noise Pollution Rules applies
Annual HSD tank integrity inspectionManagerDocumentIf Diesel Storage Licence (PESO) applies
Fuel storage area fire safety checkOperations supervisorChecklistIf Diesel Storage Licence (PESO) applies
Annual fire system service / hydro-test (IS 2190)Compliance officerDocumentAlways
POSH annual report to District OfficerCompliance officerDocumentIf POSH Internal Complaints Committee applies
2-year STP installation plan / approval (no on-site STP)Compliance officerDocumentIf Sewage Treatment Plant (STP) Consent applies
Annual lift safety certificate / inspection reportOperations supervisorDocumentIf Lifts & escalators applies
Annual earth resistance testOperations supervisorDocumentAlways
Electrical Safety Officer annual inspection and test reportOperations supervisorDocumentAlways
Annual review and erasure of personal data no longer neededOperations supervisorChecklistAlways
Annual boiler stack emission testOperations supervisorDocumentIf Steam boilers applies
Annual crèche facility reviewCompliance officerChecklistAlways

6. Things you log when they happen

These have no fixed date. Log them in the app on the day they happen, so the record is made at the time and not rebuilt later.

WhatWhenUsually logged byNeeded
Accident / injury log entryEach time it happensHousekeeping / floor staffIf Factory licence (OSH Code) applies
HWM Form 10 dispatch manifestEach time it happensOperations supervisorIf HWM Rules 2016 — SPCB CTE + CTO applies
E-waste handover receipt from registered producer/refurbisher/recyclerEach time it happensOperations supervisorIf E-Waste Management applies
Spent battery handover receipt / take-back confirmationEach time it happensOperations supervisorIf Battery Waste Management applies
DG run log entry (per operation) (each DG set)Each time it happensHousekeeping / floor staffIf Diesel Generator (DG) Air & Noise Norms applies
C&D waste dispatch to authorized processor receiptEach time it happensOperations supervisorIf Construction & Demolition (C&D) Waste applies
Faecal sludge transport manifest / FSTP receipt (each septic tank)Each time it happensOperations supervisorIf Sewage Treatment Plant (STP) Consent applies
Lift accident report to the inspectorEach time it happensOperations supervisorIf Lifts & escalators applies
Electrical accident intimationEach time it happensOperations supervisorAlways
Boiler accident reportEach time it happensOperations supervisorIf Steam boilers applies
Personal data breach intimationEach time it happensCompliance officerAlways
End-of-life solar panels handed only to a registered recycler or the producerEach time it happensCompliance officerIf E-Waste Management applies

7. Licence renewals

Enter the expiry date of each licence when you upload it. The app then creates the renewal job ahead of the expiry, so nobody has to remember the date.

RenewalOwnerNeeded
HWM authorisation renewal taskCompliance officerIf HWM Rules 2016 — SPCB CTE + CTO applies
CGWA NOC renewal taskCompliance officerIf Groundwater Extraction (CGWA) applies
ETP CTO renewal taskCompliance officerIf Effluent Treatment Plant (ETP) applies
PESO licence renewal taskCompliance officerIf Diesel Storage Licence (PESO) applies
Fire NOC renewal taskCompliance officerAlways
SPCB DG set CTO renewal taskCompliance officerIf Diesel Generator (DG) Air & Noise Norms applies
Shops & Establishments registration renewal task (state-specific cycle; some states issue lifetime certificates)Compliance officerIf Shops & Establishments Registration applies
STP Consent-to-Operate (CTO) renewalCompliance officerIf Effluent Treatment Plant (ETP) applies
Lift licence / registration — renewalCompliance officerIf Lifts & escalators applies
Lift maintenance contract (AMC) — renewalCompliance officerIf Lifts & escalators applies
Lift third-party insurance — renewalCompliance officerIf Lifts & escalators applies
Electrical installation inspection / self-certification — renewalCompliance officerAlways
Boiler registration and certificate to use — renewalCompliance officerIf Steam boilers applies
Municipal trade / health trade licence — renewalCompliance officerAlways
Structural stability certificate — renewalCompliance officerAlways
Contractor labour licences (50 or more contract workers) — renewalCompliance officerAlways
Security agency licence (PSARA) — renewalCompliance officerAlways
SPCB CTO renewal taskCompliance officerAlways

8. Your filing calendar

Filings are statutory returns you submit to a regulator. The app reminds the owner ahead of each due date and collects the figures from the jobs your team has done through the year, so the return is built from real records.

FilingDueWhereRuleNeeded
SWM Annual Return30 June every year–Solid Waste Management (SWM) 2026Always
CGWA Groundwater Abstraction & Compliance Data Submission10th of every monthCGWA Bhu-Neer portal (cgwa-bhuneer.mowr.gov.in)Groundwater Extraction (CGWA)If the rule applies
HWM Form 4 Annual Return30 June every year–HWM Rules 2016 — SPCB CTE + CTOIf the rule applies
Environmental Statement (Form V)30 September every yearState SPCB portalEnvironmental Statement (Form V)Always

9. The rules behind all this

Applies to every site of this type

RuleWhat it asks of you
Plastic Waste ManagementCovers segregating plastic waste, the single-use-plastic ban, and handing dry plastic over to authorised recyclers — applies regardless of org size.
Solid Waste Management (SWM) 2026Requires segregating waste into 4 streams (wet/dry/sanitary/special-care), registering as a Bulk Waste Generator, and either composting wet waste on-site or obtaining an EBWGR certificate from the local body.

Depends on what is on your site

RuleWhat it asks of you
Factory licence (OSH Code)If this facility employs 20 or more workers using power (or 40+ without power), it is a factory under the OSH Code 2020 (which replaced the Factories Act 1948 from 21 November 2025) and needs DISH registration, an annual factory licence, and welfare facilities (washing, first aid, rest room, canteen) for workers.
HWM Rules 2016 — SPCB CTE + CTO
E-Waste ManagementE-waste (UPS batteries, old electronics, lighting) must go only to a registered recycler — no separate CPCB registration is needed as a bulk consumer.
Battery Waste ManagementUPS/inverter batteries and other battery waste must be segregated and handed to an authorised collector, not thrown out with general waste.
Diesel Generator (DG) Air & Noise NormsRunning a diesel generator for power backup needs SPCB consent, an acoustic enclosure, and periodic stack-emission testing.
Noise Pollution RulesLimits DG-set and loudspeaker noise, including a 10pm-6am night restriction — enforced by the District Magistrate/Police, not SPCB.
Groundwater Extraction (CGWA)If groundwater is drawn from a borewell/tube well, CGWA requires monthly groundwater-level monitoring reported through their portal.
Effluent Treatment Plant (ETP)If this facility operates its own Effluent Treatment Plant for lab or process wastewater, it needs SPCB Consent to Operate, regular effluent-quality testing, and proper sludge disposal — a separate obligation from any domestic-sewage STP on the same premises.
Construction & Demolition (C&D) WasteAny renovation or demolition work must segregate C&D waste per the local authority's plan; projects over 20,000 sq.m also need EPR portal registration.
Diesel Storage Licence (PESO)Storing more than 2,500L of diesel for DG backup requires a PESO storage licence and periodic tank safety certification.
Shops & Establishments RegistrationNearly every commercial or institutional premises operating in India needs Shops & Establishments registration from the state labour department or municipal corporation — this is separate from any sector-specific licence and applies regardless of business type.
POSH Internal Complaints CommitteeAny workplace with 10 or more employees must proactively constitute an Internal Complaints Committee, including an external member, at every branch or office location — waiting until a complaint arises is itself a violation.
Sewage Treatment Plant (STP) ConsentOperating an on-site STP needs SPCB Consent to Operate plus monthly performance and sludge-disposal logs.
Lifts & escalatorsA lift runs on a licence and a maintenance contract that both expire. Where the state has a lift Act you get its statutory tests and filings; everywhere you get monthly maintenance, rescue-device checks and an accident log, because the owner answers for a defect that was known and not fixed.
Steam boilersSteam boilers for laundry, kitchens or sterilisation are pressure vessels that must be inspected every year — an expired certificate means the boiler may not legally be fired.
Rainwater harvestingWhere the state binds existing buildings, a missing or non-working structure is a standing violation and can raise the water bill; elsewhere it is the approval-time condition most often left unmaintained.
RuleWhat it asks of you
Fire Safety (NOC & Systems)Buildings above a certain height/occupancy (threshold varies by state) need a Fire Safety NOC, working fire-fighting systems (extinguishers, hydrants, sprinklers), and regular fire drills — facility management is directly responsible for this, not just the builder.
Electrical safetyEvery premises has an electrical installation that needs a current inspection or self-certification. Most fires in buildings start electrically, and a lapsed inspection is the first thing an insurer or investigator asks for.
Trade licenceHotels, restaurants, hospitals, shops and most commercial premises need a trade licence from the local body, and it is often a prerequisite for other licences and utility connections.
Occupancy & structureThe occupancy certificate is the document other licences ask for; in Maharashtra and Gujarat an older building also needs a current structural stability certificate.
Site labour dutiesThese are the labour duties that show up on site — a stocked first-aid box, an accident notice, and proof that the agencies supplying your housekeeping and security staff are licensed. Wages, provident fund and ESI stay with payroll.
Personal data protectionResident, visitor, guest, patient, student and staff records — and CCTV — are personal data. The core duties start on 13 May 2027; these tasks get the notice, breach plan and grievance contact in place before then.
Environmental Statement (Form V)If your premises runs under an SPCB consent to operate (for an STP, ETP, DG set or boiler) or a hazardous-waste authorisation, you owe the Board a yearly environmental statement — water and raw-material use, pollutants discharged, hazardous and solid waste generated, and measures taken. It is easy to miss because no renewal prompts it.
Consent to Establish / OperateOperating without a valid consent to operate is the most basic pollution-control lapse a Board can find — every other environmental check assumes it is in place.

This guide explains how the app helps you keep records. It is not legal advice; your regulator's notification is the final word.

10. Job sheets for each person

Print the section for each person and hand it over with their login. It lists only the jobs that are usually theirs; their role guide explains how to do any job in the app.

Manager

Every year

  • Annual HSD tank integrity inspection (only if Diesel Storage Licence (PESO) applies)

How to do these in the app: Manager guide.

Compliance officer (Manager access)

Every month

  • Monthly PPE provision and distribution check (only if Factory licence (OSH Code) applies)
  • Monthly machine guarding and LOTO check (only if Factory licence (OSH Code) applies)
  • CGWA abstraction and compliance data submission (only if Groundwater Extraction (CGWA) applies)

Every quarter

  • Quarterly statutory welfare facilities check (washing, first aid, rest room, canteen) (only if Factory licence (OSH Code) applies)

Every six months

  • 6-monthly certified fire system inspection (IS 2190)

Every year

  • Annual worker health checkup (hazardous stream workers) (only if Factory licence (OSH Code) applies)
  • SWM Annual Return (if BWG)
  • HWM Form 4 Annual Return (June 30) (only if HWM Rules 2016 — SPCB CTE + CTO applies)
  • Annual fire system service / hydro-test (IS 2190)
  • POSH annual report to District Officer (only if POSH Internal Complaints Committee applies)
  • 2-year STP installation plan / approval (no on-site STP) (only if Sewage Treatment Plant (STP) Consent applies)
  • Environmental Statement (Form V) to the SPCB (30 September)
  • Annual crèche facility review

Each time it happens

  • Personal data breach intimation
  • End-of-life solar panels handed only to a registered recycler or the producer (only if E-Waste Management applies)

Before the licence expires

  • HWM authorisation renewal task (only if HWM Rules 2016 — SPCB CTE + CTO applies)
  • CGWA NOC renewal task (only if Groundwater Extraction (CGWA) applies)
  • PESO licence renewal task (only if Diesel Storage Licence (PESO) applies)
  • Fire NOC renewal task
  • Shops & Establishments registration renewal task (state-specific cycle; some states issue lifetime certificates) (only if Shops & Establishments Registration applies)
  • Lift licence / registration — renewal (each lift) (only if Lifts & escalators applies)
  • Lift maintenance contract (AMC) — renewal (only if Lifts & escalators applies)
  • Lift third-party insurance — renewal (only if Lifts & escalators applies)
  • Electrical installation inspection / self-certification — renewal
  • Boiler registration and certificate to use — renewal (only if Steam boilers applies)
  • Municipal trade / health trade licence — renewal
  • Structural stability certificate — renewal
  • Contractor labour licences (50 or more contract workers) — renewal
  • Security agency licence (PSARA) — renewal

Before the licence expires

  • ETP CTO renewal task (each ETP) (only if Effluent Treatment Plant (ETP) applies)
  • SPCB DG set CTO renewal task (only if Diesel Generator (DG) Air & Noise Norms applies)
  • STP Consent-to-Operate (CTO) renewal (each STP) (only if Effluent Treatment Plant (ETP) applies)
  • SPCB CTO renewal task

How to do these in the app: Manager guide.

Operations supervisor (Supervisor access)

Every week

  • No unauthorized C&D dumping declaration (only if Construction & Demolition (C&D) Waste applies)

Every month

  • Fire system maintenance (extinguishers, hydrants, sprinklers)
  • Monthly single-use plastic ban audit
  • Dry plastic waste to authorized recycler
  • Monthly no-open-burning declaration
  • Monthly HWM segregation and storage check (only if HWM Rules 2016 — SPCB CTE + CTO applies)
  • Monthly ETP effluent quality test (each STP) (only if Effluent Treatment Plant (ETP) applies)
  • ETP sludge disposal log/receipt (each ETP) (only if Effluent Treatment Plant (ETP) applies)
  • No effluent to groundwater declaration (only if Effluent Treatment Plant (ETP) applies)
  • Monthly rainwater harvesting structure maintenance log (each rainwater pit) (only if Groundwater Extraction (CGWA) / Rainwater harvesting applies)
  • Monthly lift maintenance visit (each lift) (only if Lifts & escalators applies)
  • Monthly first-aid box check
  • Used engine oil handover to a registered collection agent / recycler (only if HWM Rules 2016 — SPCB CTE + CTO applies)

Every quarter

  • Quarterly fire escape signage and emergency lighting check
  • Fire drill and staff evacuation training record
  • Quarterly lift test by a registered person (each lift) (only if Lifts & escalators applies)
  • Lift rescue device, alarm and intercom check (each lift) (only if Lifts & escalators applies)

Every six months

  • Six-monthly lift test by an authorised person (each lift) (only if Lifts & escalators applies)
  • Lift rescue mock drill (only if Lifts & escalators applies)

Every year

  • Annual DG stack emission test (SPM/SO₂/NOₓ) (each DG set) (only if Diesel Generator (DG) Air & Noise Norms applies)
  • Annual noise level test at property boundary (only if Noise Pollution Rules applies)
  • Fuel storage area fire safety check (only if Diesel Storage Licence (PESO) applies)
  • Annual lift safety certificate / inspection report (only if Lifts & escalators applies)
  • Annual earth resistance test
  • Electrical Safety Officer annual inspection and test report
  • Annual review and erasure of personal data no longer needed
  • Annual boiler stack emission test (only if Steam boilers applies)

Each time it happens

  • HWM Form 10 dispatch manifest (only if HWM Rules 2016 — SPCB CTE + CTO applies)
  • E-waste handover receipt from registered producer/refurbisher/recycler (only if E-Waste Management applies)
  • Spent battery handover receipt / take-back confirmation (only if Battery Waste Management applies)
  • C&D waste dispatch to authorized processor receipt (only if Construction & Demolition (C&D) Waste applies)
  • Faecal sludge transport manifest / FSTP receipt (each septic tank) (only if Sewage Treatment Plant (STP) Consent applies)
  • Lift accident report to the inspector (only if Lifts & escalators applies)
  • Electrical accident intimation
  • Boiler accident report (only if Steam boilers applies)

How to do these in the app: Supervisor guide.

Housekeeping / floor staff (Worker access)

Every day

  • Daily waste weighment log
  • Food and garden waste composting / processing log
  • Daily C&D waste volume log by category (only if Construction & Demolition (C&D) Waste applies)
  • Daily borewell pump run log (each borewell) (only if Groundwater Extraction (CGWA) applies)

Every week

  • On-site C&D waste segregation zone photo (4-category) (only if Construction & Demolition (C&D) Waste applies)
  • Weekly groundwater abstraction log (per borewell) (each borewell) (only if Groundwater Extraction (CGWA) applies)

Every month

  • Monthly groundwater level monitoring (each borewell) (only if Groundwater Extraction (CGWA) applies)
  • Monthly ETP performance log (each ETP) (only if Effluent Treatment Plant (ETP) applies)
  • Sanitary waste stream handover log (SWM 2026)
  • Special-care waste stream handover log (SWM 2026)
  • Septic tank / cesspool desludging log (each septic tank) (only if Sewage Treatment Plant (STP) Consent applies)

Each time it happens

  • Accident / injury log entry (only if Factory licence (OSH Code) applies)
  • DG run log entry (per operation) (each DG set) (only if Diesel Generator (DG) Air & Noise Norms applies)

How to do these in the app: Worker guide.