Compliance for Waste Handler / Recycler / CBWTF

Waste Handler — Scrap Dealer Compliance & SWM Rules 2026

19 rules typically apply to a waste handler — scrap dealer in India, covering waste management (including SWM Rules 2026) and general compliance obligations.

This is EarthReheal WasteLedger's plain-language interpretation, for informational purposes only — not legal advice. Always confirm against the official rule text and your regulator. Rules shown reflect our current catalog and may not capture every site-specific condition.

Waste Management (9)

Segregation, disposal, EPR, and related waste-stream obligations — including SWM Rules 2026.

Registered Waste Processor

If this facility handles more than 5 metric tonnes of waste per day, it needs SPCB/PCC authorization (Form I application, field verification, Form II authorization) confirming it meets Schedule I & II processing/treatment standards.

Read the full guide →

HWM Rules 2016 — SPCB Authorization

Read the full guide →

CBWTF Authorization

If this facility operates as a Common Bio-Medical Waste Treatment Facility, it needs SPCB authorization (Form-II, with GPS-tagged facility map and contingency plan), the required treatment equipment (incinerator, autoclave/microwave, shredder, ETP), and an annual Form-IV report by 30 June.

Read the full guide →

Registered E-Waste Recycler

If this facility recycles e-waste, it must register on the CPCB EPR portal (requiring a prior valid CTO and HWM 2016 authorization from the SPCB), submit recycling-capacity data and a geotagged facility video, and pass CPCB facility verification.

Read the full guide →

Registered Battery Recycler

If this facility refurbishes or recycles waste batteries, it must register with the SPCB via the CPCB EPR portal (Form 2A/2B) — registration is valid 5 years and subject to periodic SPCB audits.

Read the full guide →

Plastic Waste Management Rules, 2016 (as amended)

Read the full guide →

Waste Tyre EPR / HWM Amendments

Read the full guide →

Dry Recyclable Sale to Authorized Buyer

Read the full guide →

Construction & Demolition (C&D) Waste

Any renovation or demolition work must segregate C&D waste per the local authority's plan; projects over 20,000 sq.m also need EPR portal registration.

Read the full guide →

General Compliance (10)

Reporting, licensing, and regulatory obligations beyond waste.

Want EarthReheal WasteLedger to track waste handler — scrap dealer compliance for you automatically?

Talk to us →