Compliance for Material Recovery Centre (MRC/MRF)

Municipality Recycling Centre (MRC) Compliance & SWM Rules 2026

17 rules typically apply to a municipality recycling centre (mrc) in India, covering waste management (including SWM Rules 2026) and general compliance obligations.

This is EarthReheal WasteLedger's plain-language interpretation, for informational purposes only — not legal advice. Always confirm against the official rule text and your regulator. Rules shown reflect our current catalog and may not capture every site-specific condition.

Waste Management (8)

Segregation, disposal, EPR, and related waste-stream obligations — including SWM Rules 2026.

Registered MRF

As a Material Recovery Facility, this centre must maintain SPCB authorization, minimum processing capacity, worker PPE/safety training, and processed-waste record-keeping per SWM Rules 2026 Schedule II standards.

Read the full guide →

HWM Rules 2016 — SPCB CTE + CTO

Read the full guide →

E-Waste Collection Point

As an e-waste collection point, this facility isn't itself required to register on the CPCB portal (only manufacturers/producers/refurbishers/dismantlers/recyclers need that), but must hand over collected e-waste only to a CPCB-registered recycler.

Read the full guide →

Battery Collection Point

As a battery waste collection point, this facility must store collected batteries segregated and hand them over only to a CPCB/SPCB-registered recycler or refurbisher — collection itself doesn't need separate CPCB registration, but the handover chain does.

Read the full guide →

Authorized Plastic Recycler

If this facility is registered as an authorized plastic waste processor/recycler, it must maintain CPCB EPR-portal registration and issue EPR certificates for the plastic waste it processes.

Read the full guide →

Waste Tyre EPR

If this facility collects, stores, or processes waste tyres, it must register on the CPCB EPR Tyres portal and generate EPR certificates for processed tyre material (crumb rubber, reclaimed rubber, pyrolysis oil).

Read the full guide →

Dry Recyclable Sale to Authorized Buyer

Read the full guide →

Construction & Demolition (C&D) Waste

Any renovation or demolition work must segregate C&D waste per the local authority's plan; projects over 20,000 sq.m also need EPR portal registration.

Read the full guide →

General Compliance (9)

Reporting, licensing, and regulatory obligations beyond waste.

Want EarthReheal WasteLedger to track municipality recycling centre (mrc) compliance for you automatically?

Talk to us →