Compliance for EV Charging Station / Battery Swapping Station
EV Charging Station Compliance & SWM Rules 2026
11 rules typically apply to a ev charging station in India, covering waste management (including SWM Rules 2026) and general compliance obligations.
This is EarthReheal WasteLedger's plain-language interpretation, for informational purposes only — not legal advice. Always confirm against the official rule text and your regulator. Rules shown reflect our current catalog and may not capture every site-specific condition.
Waste Management (4)
Segregation, disposal, EPR, and related waste-stream obligations — including SWM Rules 2026.
BATTERY 2022
Read the full guide →
EWASTE 2022
Read the full guide →
HWM 2016
Read the full guide →
Construction & Demolition (C&D) Waste
Any renovation or demolition work must segregate C&D waste per the local authority's plan; projects over 20,000 sq.m also need EPR portal registration.
Read the full guide →
General Compliance (7)
Reporting, licensing, and regulatory obligations beyond waste.
EV Charger Safety & CEA Regulations
EV charging equipment must meet Central Electricity Authority safety regulations and BIS IS 17017 standards for earthing, fire protection, and charger certification.
Read the full guide →
Battery Swapping Station Guidelines
Operating a battery swapping or charging station must follow the Ministry of Power's 2024 guidelines covering electricity connections, battery-to-grid capability, and equipment standards.
Read the full guide →
AIR ACT DG
Read the full guide →
NOISE 2000
Read the full guide →
Diesel Storage Licence (PESO)
Storing more than 2,500L of diesel for DG backup requires a PESO storage licence and periodic tank safety certification.
Read the full guide →
Shops & Establishments Registration
Nearly every commercial or institutional premises operating in India needs Shops & Establishments registration from the state labour department or municipal corporation — this is separate from any sector-specific licence and applies regardless of business type.
Read the full guide →
POSH Internal Complaints Committee
Any workplace with 10 or more employees must proactively constitute an Internal Complaints Committee, including an external member, at every branch or office location — waiting until a complaint arises is itself a violation.
Read the full guide →
Want EarthReheal WasteLedger to track ev charging station compliance for you automatically?
Talk to us →