Compliance for Cold Storage / Logistics / Warehousing
Cold Storage Compliance & SWM Rules 2026
15 rules typically apply to a cold storage in India, covering waste management (including SWM Rules 2026) and general compliance obligations.
This is EarthReheal WasteLedger's plain-language interpretation, for informational purposes only — not legal advice. Always confirm against the official rule text and your regulator. Rules shown reflect our current catalog and may not capture every site-specific condition.
Waste Management (5)
Segregation, disposal, EPR, and related waste-stream obligations — including SWM Rules 2026.
Plastic Waste Management
Covers segregating plastic waste, the single-use-plastic ban, and handing dry plastic over to authorised recyclers — applies regardless of org size.
Read the full guide →
Solid Waste Management (SWM) 2026
Requires segregating waste into 4 streams (wet/dry/sanitary/special-care), registering as a Bulk Waste Generator, and either composting wet waste on-site or obtaining an EBWGR certificate from the local body.
Read the full guide →
E-Waste Management
E-waste (UPS batteries, old electronics, lighting) must go only to a registered recycler — no separate CPCB registration is needed as a bulk consumer.
Read the full guide →
Battery Waste Management
UPS/inverter batteries and other battery waste must be segregated and handed to an authorised collector, not thrown out with general waste.
Read the full guide →
Construction & Demolition (C&D) Waste
Any renovation or demolition work must segregate C&D waste per the local authority's plan; projects over 20,000 sq.m also need EPR portal registration.
Read the full guide →
General Compliance (10)
Reporting, licensing, and regulatory obligations beyond waste.
Ozone-Depleting Substances (ODS)
Restricts servicing or topping up older AC/refrigeration equipment that relies on CFC/HCFC refrigerants.
Read the full guide →
Fire Safety (NOC & Systems)
Buildings above a certain height/occupancy (threshold varies by state) need a Fire Safety NOC, working fire-fighting systems (extinguishers, hydrants, sprinklers), and regular fire drills — facility management is directly responsible for this, not just the builder.
Read the full guide →
Factories Act Registration
If this facility employs 10 or more workers using power (or 20+ without power), it needs DISH registration, an annual factory licence, and welfare facilities (washing, first aid, rest room, canteen) for workers.
Read the full guide →
Diesel Generator (DG) Air & Noise Norms
Running a diesel generator for power backup needs SPCB consent, an acoustic enclosure, and periodic stack-emission testing.
Read the full guide →
Noise Pollution Rules
Limits DG-set and loudspeaker noise, including a 10pm-6am night restriction — enforced by the District Magistrate/Police, not SPCB.
Read the full guide →
Groundwater Extraction (CGWA)
If groundwater is drawn from a borewell/tube well, CGWA requires monthly groundwater-level monitoring reported through their portal.
Read the full guide →
Sewage Treatment Plant (STP) Consent
Operating an on-site STP needs SPCB Consent to Operate plus monthly performance and sludge-disposal logs.
Read the full guide →
Diesel Storage Licence (PESO)
Storing more than 2,500L of diesel for DG backup requires a PESO storage licence and periodic tank safety certification.
Read the full guide →
Shops & Establishments Registration
Nearly every commercial or institutional premises operating in India needs Shops & Establishments registration from the state labour department or municipal corporation — this is separate from any sector-specific licence and applies regardless of business type.
Read the full guide →
POSH Internal Complaints Committee
Any workplace with 10 or more employees must proactively constitute an Internal Complaints Committee, including an external member, at every branch or office location — waiting until a complaint arises is itself a violation.
Read the full guide →
Want EarthReheal WasteLedger to track cold storage compliance for you automatically?
Talk to us →